Built for Canadian electrical work

Your best electrician. Now on every job.

Look up codes, run calculations, analyze drawings, estimate jobs, and win bids — with an AI copilot that understands the CEC.

No credit card Every feature unlocked Personal onboarding
VoltIQ Code Agent
Live
Ontario2024 CEC
What conductor size do I need for a 200A residential service?
Start with the dwelling-service rules CEC verified

The permitted size depends on conductor material, insulation, terminations, and installation method. Check the dwelling-service allowance and confirm the final selection with Ontario utility requirements.

CEC Rule 4-006CEC Table 39
Can I use aluminum conductors at the panel?
Confirm every termination is aluminum-rated CEC verified

Use only listed aluminum-compatible equipment and connectors. Prepare and torque each termination exactly as the panel and connector manufacturers specify.

CEC Rule 12-118Manufacturer instructions
What about voltage drop to a detached garage?
Calculate from the actual circuit CEC verified

Use circuit voltage, calculated load, conductor material, and one-way length. Check both the feeder and total installation voltage drop before choosing the conductor.

CEC Rule 8-102
What should I verify before inspection?
Complete the service safety check CEC verified

Verify service layout, overcurrent protection, grounding and bonding, clearances, labels, approved equipment, and required ESA notification before concealment or energization.

OESC Sections 2, 6 & 10ESA notification requirements
Ask a follow-up about the Canadian Electrical Code…
Jurisdiction awareAll Canadian provinces
10 secCode answers
30 secSpec summaries
< 10 minComplete estimates
11Canadian jurisdictions
$0Software to install

From first look to final bid.

Replace scattered code books, spreadsheets, and point tools with one intelligent workspace built for electrical contractors.

10 sec answers

AI Code Agent

Ask code questions in plain English and get clear answers with specific CEC rule citations.

Learn more
Catch issues early

Photo Analysis

Assess panels, wiring, and job-site conditions for compliance before the inspector arrives.

Learn more
30 sec summaries

Spec & Scope Review

Summarize long specifications and flag missing, conflicting, or overlooked requirements.

Learn more
Hours saved

Material Takeoff

Turn drawings and site photos into structured device counts and a pricing-ready bill of materials.

Learn more
Bid-ready pricing

Job Estimating

Build complete estimates with materials, labour, overhead, markup, and provincial tax.

Learn more
CEC referenced

Field Calculators

Run voltage drop, sizing, conduit fill, load, ampacity derating, and box fill calculations.

Learn more

More certainty in every decision.

VoltIQ brings code intelligence into the actual workflow — so your team spends less time searching and more time doing profitable work.

  • Find cited answers without paging through a code book
  • Catch scope gaps and compliance issues before they cost you
  • Standardize estimates and field checks across your team
  • Work from any browser, on any device
Typical code lookup98% faster
Manual search20 min
With VoltIQ10 sec
60–90 minsaved per spec review
All-in-onefield-to-bid workflow

One copilot. Every role.

01

Apprentices

Build code confidence with plain-language explanations.

02

Journeymen

Move faster on complex jobs and field decisions.

03

Estimators

Verify sizing, build prices, and draft bids in one place.

04

Business owners

Reduce rework and standardize field practices.

Put VoltIQ to work on your next job.

Get full access, a personal onboarding call, and weekly ROI check-ins. No credit card. No commitment.

Contact pilots@voltiq.ca